Delta TP70P-32TP1R combines a 7-inch, 800×480-pixel colour touchscreen, a built-in PLC and 16 digital inputs + 16 relay outputs in one TP70P series operator panel. The 32 identifies the total digital I/O count; it does not mean 32 inputs or 32 outputs.

It can be considered for reading pushbuttons, limit switches and sensors, and controlling contactors, valves and indicators. Within the Delta TP panels and remote I/O group, this model is an operator panel with a built-in PLC. The machine project determines which functions run locally and which depend on communication.

Display, power supply and mounting

Supply: 24 V DC. Display: 7-inch TFT LCD, 800×480 pixels. Overall dimensions: 205.6×142.6×49 mm. Panel opening: the instruction sheet specifies 190.1–191.0×127.1–128.0 mm, with a panel thickness of 0.5–4 mm.

Measure the existing opening before fitting a replacement. Check the gasket, mounting brackets and clearance for rear wiring. When reviewing mounting and power connections, confirm that the panel is supported and sealed correctly.

Digital inputs and I/O addresses

16 inputs: X0–X7 and X10–X17. 16 outputs: Y0–Y7 and Y10–Y17. X and Y addresses use octal numbering, so X10 follows X7 and Y10 follows Y7; no channels are missing. Input commons are S/S0 and S/S1; output commons are C0 and C1.

For 24 V DC sensor wiring, verify the PNP/NPN arrangement and S/S common connection together. Wire colours and old labels alone do not establish the correct circuit. Even when a program originated from a Delta DVP PLC, compare every physical terminal with its actual program address.

Relay outputs and load selection

Relay ratings: 1.5 A per point and 5 A per COM for resistive loads; switching voltage is 250 V AC or below 30 V DC. Check both individual output current and total common-group current. Inductive loads, starting current and switching frequency require separate assessment.

A relay contact does not generate the load supply voltage; provide the appropriate load supply and protection separately. Fit suppression suitable for the voltage and type of contactor or valve coil. Relay Y outputs must not be used as servo pulse-command or fast PWM outputs.

Programming and communication

Use TPEditor for the screen project and ISPSoft for the built-in PLC; WPLSoft support is also documented for the series. Record the engineering tool, version and target model used by an existing project. Preserve the screen project and PLC program separately. The Delta COMMGR page provides an additional reference for connection setup.

USB Type-B is used for program transfer. On the DB9 connector, COM2 provides RS-485 for PLC mode, and COM3 provides RS-485 for panel mode. The instruction sheet assigns COM2 to pin 6 D+ / pin 7 D−, COM3 to pin 8 D+ / pin 9 D−, and pin 5 to GND. Verify the pinout when selecting a Delta PLC cable.

Record the station address, baud rate, data format, protocol and the role of each device in the exchange. A functioning display does not establish that PLC-side communication is correct; check both functions separately.

Differences within the series

TP70P-16TP1R, TP70P-22XA1R and TP70P-21EX1R provide references for different I/O arrangements in the series. TP70P-RM0 is a different version without physical onboard I/O. These models must not be treated as direct replacements for the 32TP1R without checking the terminals and project.

When comparing the TP04P family or TP04P-32TP1R, assess the display, mechanical dimensions, project and wiring independently. Similar order codes alone do not establish replacement suitability.

Manuals and files

For installation, terminal and communication information, start with Delta TP panel files; consult Delta PLC and HMI manuals for further documentation. In the shared TP70P manual, use the column and wiring drawings for the 32TP1R.

Editor's Note

When checking a used panel, a working display is only the beginning. Test the touchscreen at the corners and centre, and look for flickering, fading or inaccurate touch response. Then check the PLC RUN state and confirm that the program actually executes.

Before downloading anything, back up every accessible screen project and PLC program. A test download can stop a working machine from operating. Keep communication settings and software versions with the backups; those small details can save hours later.

A clicking relay is not proof of a healthy output. Use a suitable low-voltage test load to check contact operation, then assess stability under load. If operation is intermittent or terminals show heat damage, examine the load current and coil suppression too. Disconnect the field circuit before applying an external test voltage.

For input testing, establish the S/S wiring first and check channels one at a time. If the first eight inputs work but the second eight do not, inspect the second common connection and terminals before changing the program. One broken common wire can resemble eight failed inputs.

For communication faults, check D+/D−, station addresses and the COM2/COM3 selection before condemning the panel. When replacing the unit, compare the rear label, terminal arrangement and working project together. Validate every input and output under controlled conditions before returning the machine to operation.

Related topics

Delta HMI Files · Delta HMI Programming and HMC Cables · Delta HMI Modules and Accessories · Delta HMI Communication Peripheral Units · Delta PLC accessories

Navigation: TP70P main page · Delta PLC section · Delta user manuals · Used Delta products

External references

Delta TP70P-32TP1R instruction sheet (includes English and Turkish) · TP70P Quick Start (English)