6ES5 710-0SA41

Siemens 6ES5 710-0SA41 – Long S5-110 Mounting Rack for 16 I/O Modules

Siemens 6ES5 710-0SA41 is a long mounting rack for 16 I/O modules in the SIMATIC S5 family. The S5-110A arrangement provides 18 positions including CPU and power supply. The bus cable and module sockets provide the carrier's electrical connections.

It accommodates S5-110 modules along one mounting assembly. Sixteen refers to module capacity; calculate the number of input/output points from the channel counts of the installed cards. For a used assembly, specify separately whether sockets, bus cable, CPU and power supply are included.

Dimensions and panel layout

The rail measures 813 × 75 × 25 mm; rack weight is approximately 2.56 kg. When allocating space for S5 racks and carriers, measure module projection, cable bends and removal access separately. The 25 mm rail depth is not the overall depth of a populated assembly.

6ES5 710-0SA11 is the short, eight-I/O-position version. Before replacing a rack, compare the panel fixing pattern, rail straightness and socket holders. For stacked installation, observe the manual's minimum 300 mm centre spacing, while retaining sufficient cable-duct and servicing space.

Location coding and AA/SA versions

SA41 I/O positions are coded 0–15. The older manual identifies 6ES5 710-0AA11 and 6ES5 710-0AA41 with coding starting at 1. Record socket markings and the existing wiring arrangement when checking the PLC program.

Record the rack number, module position and monitored PLC input/output address on the same inspection sheet. In a multi-rack panel, do not derive addresses solely from physical sequence. Comparing suffixes and position markings before installation helps reveal addressing differences.

Inter-rack cables and system arrangement

The S5-110A manual specifies 0.32 m 6ES5 713-0AD20 for stacked long racks. When selecting S5 cables and connectors, check the installed cable's complete code, pins, latch and routing. Confirm its wiring before treating a similar-length cable as an equivalent.

In the S5-110S/B manual, 6ES5 718-0AF00 is a 0.5 m shielded inter-rack cable. That system houses the CPU in a separate central enclosure. When applying an S5-110A layout to an S5-110S installation, review the central connection and I/O bus arrangement separately. The rack order number alone does not determine every cable.

Power supply, grounding and bus inspection

Assess the S5 power supply together with the consumption of the installed cards. An empty mounting position alone does not establish adequate electrical capacity for another module. Include the existing load and cable losses in the power supply assessment; check the panel drawings for the PELV arrangement.

Inspect the ground connection, mechanical fixing and bus sockets. If several cards become unstable together, include shared supplies and connections in the measurement sequence. Measure DC voltage against the correct reference; perform continuity checks with power removed and the relevant circuits disconnected.

Checking a used rack

Use known-good digital input and digital output cards suitable for this system to check the required locations in sequence. If the same card works in another position, compare the socket, coding and bus path. Keep output loads controlled during testing; checking the rack does not require machine movement.

If an inductive sensor or photoelectric sensor signal disappears, include the carrier connections in the investigation. Record measurement points and affected module positions when examining the complete Siemens S5 system. Photograph bent rails, loose sockets and repaired bus cables as part of the used-unit assessment.

Editor’s Note

Ask for a photograph showing the complete rack. Alongside a readable label, check that the 813 mm rail is straight and the sockets are complete. Do not try to straighten a bent carrier by forcing modules into place.

Clarify what “16-way” means: this rack has 16 I/O module positions. Obtain written confirmation that any CPU, power supply or cards visible in the photograph are included in the price.

If the original rack has an AA suffix and the replacement has an SA suffix, compare the socket numbers side by side. A different starting number can prolong fault finding even with sound parts. Photograph cables, sockets and position markings before removal.

Pay attention to bus-cable bends and plastic socket holders. If a section is wrapped in tape, inspect the repair beneath it. Check with power removed, then test every position that will be used rather than stopping at the first working socket.

For a used unit, specify the complete model, quantity, label photograph, working/faulty condition and price. Sales require an invoice; returns are not accepted, and workshop testing is available. To offer a rack for sale, send its details to otomasyonavm@gmail.com.

OtomasyonAVM resources and PDFs

+ 6ES5 710-0SA41 model page and Second-hand SIMATIC S5 models.

+ Shared Siemens S5 PDF archive. Check document coverage for S5-110A / S5-110S and 710-0SA41.

+ S5 racks and carriers and S5 cables and connectors.

Related topics

+ 6ES5 710-0SA11 short rack · 6ES5 710-0AA11 · 6ES5 710-0AA41.

+ 6ES5 713-0AD20 connecting cable · 6ES5 718-0AF00 connecting cable. Select parts against the existing system drawings.

Browse SIMATIC S5

+ SIMATIC S5 · S5 90/110 modules · S5 power supplies.

+ S5 digital input/output range · Siemens second-hand range.

Siemens and external references

+ Siemens S5-110A operating instructions, GWA 4NEB 807 0690-02 – English: printed 1.11 technical table; 2.1–2.3 installation and layout; 6.1 spare parts and AA/SA coding note.

+ Siemens S5-110S/B operating instructions, GWA 4NEB 807 2121-02 – English: separate central enclosure and I/O arrangement; printed 29, 718-0AF00 cable entry.