6ES7 194-1LY10-0AA0
Siemens 6ES7194-1LY10-0AA0 ET 200 PUR Bus and Power Cable
6ES7194-1LY10-0AA0 is a five-core cable with a PUR outer sheath used to carry PROFIBUS communication and the electronics/sensor supply in a common cable. Within the Siemens industrial automation range, it is listed among ET 200X network accessories. For Siemens ET 200 distributed I/O systems, it is supplied as cable without preassembled connectors; the required length and end connections are selected for the application.
Siemens documentation describes this cable as oil-resistant and suitable for trailing applications, with conditional resistance to welding effects. This does not establish unrestricted protection in every welding environment. In machine and process automation applications, assess the route, movement and surrounding conditions together. When selecting ET 200 network connection accessories, check that the end connections match the installed hardware as well as checking the cable itself.
Five checks for cable selection and replacement
1. Complete code and sheath type: Verify 6ES7194-1LY10-0AA0 on the cable marking. The related 6ES7194-1LY00-0AA0 is the standard version with a PVC sheath. When reviewing ET 200 system architecture and connection options, do not select a replacement solely by its core count. In moving sections especially, establish a cable type that meets the existing operating conditions.
2. Length and end preparation: Older Siemens catalogs also list 6ES7194-1LY10-0AA0-Z, with -Z requiring the length to be specified separately in metres. Measure the route, connection allowances and travel distance before determining the required length. In spare cable records for PLC based control systems, include the complete code, cut length, connectors at both ends and conductor assignments.
3. Movement, bending and environment: Inspect sections exposed to rubbing, crushing or repeated bending at one point. In SIMATIC S7 control systems, these are useful starting points when faults appear during machine movement. Use application-specific manufacturer data for bend radius, tensile load and movement cycles; the PUR sheath description alone does not establish these limits.
4. Connectors, shielding and supply wiring: Check the connector cable entry range, gland and strain relief. Prepare the communication conductors, supply conductors and shield connection according to the wiring diagram for the installed basic module. When wiring Siemens PLC and I/O products, verify pin assignments and label both cable ends instead of relying solely on conductor colours.
5. Verification after replacement: With power isolated and both cable ends disconnected from devices, check conductor continuity and shorts between conductors. Then follow the plant commissioning procedure to check supply voltage under load and monitor communication through normal operation. Comparing HMI operator panel alarm records with machine movement can help locate interruptions that occur only at particular positions.
PDF manuals and cable references
Visit the Siemens ET 200 PDF manuals page for relevant documentation. ET 200X Distributed I/O Device, 02/2003, EWA 4NEB 780601602-06 lists this cable in Appendix A, Table A-7, printed page A-7. The ET 200X accessories section of the Siemens ST 40 catalog also describes its PUR sheath and length specification. Share photographs of the cable marking and end connections through the Siemens product technical contact page.
Editor's note: Checking a cable only while the machine is stationary can miss an intermittent communication fault. Record crushed sections, tight bends at gland exits and connections placed under tension during movement. When replacing the cable, correct the routing that caused the damage as well.
Related topics and Siemens navigation
Product families
Siemens main menu |
Siemens PLC products |
SIMATIC S7
ET 200 resources
ET 200 products |
ET 200 system overview |
ET 200 PDF manuals
Control and assistance
HMI operator panels |
SCADA systems |
Siemens product enquiries