6ES5 895-4SF11

Siemens 6ES5 895-4SF11 COM PMC Parameter Assignment Software

Siemens 6ES5 895-4SF11 is listed as a COM PMC parameter assignment package for SIMATIC S5, supplied in German on 5.25-inch floppy disks. This item appears in the S5 expansion and supporting products section. Selection depends on the software release, disk contents and existing plant project rather than the electrical specifications used to select an I/O board.

Siemens documentation identifies PMC as the Process Monitoring and Control System. When reviewing an existing Siemens S5 installation, establish where the package fits into its monitoring, message and configuration arrangements. Siemens also references COM PMC in the CP 552 manual when discussing process control messages; this does not establish compatibility with every CP 552 revision.

COM PMC and STEP 5 are separate packages

The catalogue describes COM PMC as parameter assignment software. The 6ES5 885-0SA11 STEP 5 basic package and 6ES5 894-0MA02-0UG4 STEP 5 upgrade are separate order items. Identify the base software and supporting packages used by the machine from its installation records.

Understanding PLC programming languages and PLC programming helps when examining the control logic. Reading a ladder diagram or function block diagram, however, is a separate maintenance task from opening a PMC configuration. First establish whether the missing file is the PLC program, a parameter project or a message text file.

Check the disks, computer and software release

5.25-inch describes the physical media size. It does not establish disk density, file system, the number of disks or the required RAM. Record the release shown on the labels, any installation notes and the configuration of the original working computer.

Identify the SIMATIC S5 CPU and the engineering environment separately. Confirm compatibility before selecting a Windows release, a virtual machine or another S5 CPU for this package. Reading the files is only the first stage: installation and access to the existing project must also be demonstrated.

Preserve the project and identify the communication path

Keep separate records for the installation disks, machine project files and the application held on S5 memory modules. An installation package is not a backup of a missing machine project. Preserve the software folders, project directories and connection settings before replacing the original computer.

Before planning an online session, identify the installed S5 communication hardware, interface modules and cables and connectors. Include the exact order number of processors such as the CP 535 in the service record. Mentioning these products here does not establish that this COM PMC package communicates directly with each of them.

When tracing a message to the machine, compare the digital input, digital output and combined I/O addresses with the electrical drawings. Editing a message does not repair its associated sensor or output circuit. Use the basic PLC operating principles to trace the physical signal before checking its software mapping.

Acceptance checks for a used software package

The supply record should state the complete order number, language, release, disk count, readability and included documentation. A label photograph is not a functional test. Check file access, startup in a suitable environment and operation with a copy of the existing project in stages, recording the actual results.

Editor’s note

A clean label is a useful starting point, but it does not tell you whether an old disk is healthy. Look for mould, tears or signs of surface damage before inserting questionable media into a good drive.

Keep the readable original out of day-to-day use. Make and verify a backup first, then carry out installation trials from a working copy. Preserving the last usable source matters more than getting through the first test quickly.

Take your time with the German menus. Saving a project and transferring data to the plant are different operations. Understand each confirmation and check the change in a project copy before continuing.

A successful startup is encouraging, but finish the check. Can it open the customer’s project copy, find the expected files and work without a release conflict? Base acceptance on those results, using a controlled test environment.

If the old PG still works, keep it available until its replacement has been proven. Record the software, project locations and connection settings together. Screenshots and a clear file list can save the next technician hours of guesswork.

OtomasyonAVM resources and PDFs

+ 6ES5 895-4SF11 product and information page.

+ Siemens S5 used models and system information.

+ OtomasyonAVM shared SIMATIC S5 PDF archive. Treat these system manuals separately from the installation documentation for the actual COM PMC release supplied.

Related topics

+ About Siemens S5 PLC and the PLC programming guide.

+ S5 communication modules and S5 memory modules.

Browse SIMATIC S5

S5 expansion products  |  SIMATIC S5  |  Siemens S5 PLC  |  Siemens second-hand homepage

Siemens and external references

+ Siemens COM 552 / CP 552 manual, 6ES5 998-3SE22, Release 05, Volume 1, English. References COM PMC in the context of process control messages; this is not the installation manual for order number 6ES5 895-4SF11.

+ Siemens SIMATIC S5 PMCPRO manual, C79000-G8500-C840-01, German, 1996. Additional PMC family reference; requirements for this later release must not be applied directly to the 4SF11 package.