6ES7 138-4GA50-0AB0
6ES7 138-4GA50-0AB0 is the Siemens SIMATIC ET 200S 4SI IO-Link electronic module. It operates as an IO-Link master with four point-to-point communication ports. Measuring 15 mm wide, the module connects compatible field devices to a Siemens ET 200 station.
Device Description
IO-Link enables data exchange between a master and a sensor or actuator. Depending on the connected device, this can include measurements, parameters and diagnostic information alongside switching states. When selecting an IO-Link-capable pressure sensor, for example, check how its process data is encoded as well as its measuring range.
Check the communication specifications of the sensors intended for the 4SI IO-Link. Two devices with the same connector may have different data structures and parameters. When interpreting a measurement in the PLC, use the device documentation to establish data length, signed values, units and scaling.
Technical Data
Manufacturer: Siemens
Order number: 6ES7138-4GA50-0AB0
System family: SIMATIC ET 200S
Module designation: 4SI IO-Link
Function: IO-Link master
Number of ports: 4
Port modes: IO-Link, DI, DO, disabled
Supply: 24 V DC from the power module
Communication rates: COM1: 4.8 kBd; COM2: 38.4 kBd
IO-Link cable: Unshielded, maximum 20 m
IO-Link conductor cross-section: Minimum 0.25 mm²
Output current in DO mode: 100 mA per channel
Maximum process data: 8 input / 8 output bytes per port; 32 input / 32 output bytes for the module
Dimensions: 15 × 81 × 52 mm — width × height × depth
Typical power loss: 1 W
Check communication speed and process data length together when choosing a device. An IO-Link label does not establish that every feature will be available with every master. When updating an existing installation, compare the device's required communication rate, electrical connections and process data allocation with the installed equipment.
Terminal Bases and Wiring
Compatible terminal bases:
TM-E15S26-A1: 6ES7193-4CA40-0AA0 — screw terminals.
TM-E15C26-A1: 6ES7193-4CA50-0AA0 — spring terminals.
TM-E15N26-A1: 6ES7193-4CA80-0AA0 — Fast Connect.
The Siemens wiring diagram requires AUX1 and M on the associated power module to be connected. Check the existing potential distribution and terminal markings before carrying out the work. Related products are listed in our ET 200 terminal blocks section.
When preparing sensor cables and connectors, match pin numbers to the device diagram rather than relying on conductor colours alone. Trace C/Q, L+ and M using the connection drawing. Arrange cable ducts and other control panel components so that wiring does not strain the terminals.
Configuration and S7-PCT
S7-PCT is used for IO-Link configuration of this model. The connected device's IODD file supplies its description and parameter information to the configuration environment. Select the file for the exact sensor model; using a similarly named device description can cause data interpretation problems even if communication is established.
Prepare a port schedule before commissioning. Record the device reference, purpose, operating mode and PLC data allocation for each port. For conventional switching signals, review the requirements alongside the digital input and digital output functions needed by the application.
Unconfigured ports are disabled. Include the port setting in your checks if no data is received during initial setup. Compare the station's communication interface reference and firmware against the compatibility information in the manual. Our PROFIBUS and PROFINET information page explains the network terminology.
Fault Checks and Commissioning
When checking the supply, measure the voltage at the field device under load as well as at the power supply output. Assess power supply capacity, cable routing and connection points together. If replacing a DIN rail power supply, recalculate the requirements of all connected loads.
If the red SF indicator is illuminated, read the diagnostic information. An LED alone is insufficient to identify a defective module. Check port configuration, device selection, wiring and supply in sequence, recording the result after each change. This helps separate the original problem from the effects of subsequent adjustments.
Test outputs only when the connected machinery is in a safe condition. If external relays and sockets are used, compare the coil's electrical requirements with the port's output rating. Include behaviour after power restoration and CPU restart in the commissioning plan.
Editor's Recommendations and Related Topics
A useful maintenance record combines the module reference, terminal base, field device references, port assignments and configuration backup. Prepare these before replacing a component. Returning a module to factory settings without first preserving a working configuration can make fault investigation more difficult.
Before purchasing, confirm whether the terminal base and other accessories are included with the electronic module. Browse ET 200 connection modules for related station components, or read our Siemens ET 200 overview for background on the system family.
User Manuals and PDF Documents
+ Siemens ET 200 user manuals — PDF archive page.
+ Siemens 6ES7 138-4GA50-0AB0 — 4SI IO-Link user manual — Manufacturer's manual for this model.
+ 4SI IO-Link terminal bases and wiring examples — PDF page 10.
+ Siemens ET 200 general catalogue archive — System background; use the 4SI IO-Link manual for model-specific procedures.
++ Siemens Automation Main Page
++ Siemens Automation Contact — For enquiries to Otomasyon AVM.
Reminder: Confirm current availability, product condition and scope of supply for Siemens 6ES7 138-4GA50-0AB0 before purchasing. Some devices offered by Otomasyon AVM are used products; assess the individual description and photographs accordingly. Products will not be restocked once available stock is exhausted.
Note: The information, commissioning suggestions and documents on this page are provided for general guidance, are non-binding and may be updated. For definitive application details, consult the device label, the connected field devices' documentation and the manufacturer's manual. The Otomasyon AVM Community welcomes practical feedback. You can share your operating experience and suggestions with us.